Factors affecting engineering investment in the design phase of mining engineering projects

(I) General Plane Design Whether the general plan design is reasonable or not has a significant impact on the economic rationality of the entire design. Correct and reasonable general plan design can not only reduce the amount of construction work, save land, speed up the construction progress, reduce the cost of use and the cost of the project after operation, and can create good production conditions and working environment for the enterprise.
(II) Process design Process design includes construction scale, standard and product plan, process flow and selection of main equipment, main raw materials and fuel supply; “three wastes” treatment and environmental protection measures; in addition, production organization and labor quota. It is a major factor in determining the skill level of an enterprise.
(III) Architectural design The architectural design shall determine the technical requirements of the plane, three-dimensional design and structural scheme of the project on the basis of reasonable consideration of the production organization and construction conditions. The architectural design should not only meet the functional requirements of each building (structure), but also make the project building a good style.

Walk-behind Laser Screed

Walk behind Laser Screed is mainly used in large area concrete construction, such as large workshop, airport, the plaza and so on.

walk behind laser screed

- Adopts imported laser transmitter and receiver.

- Hydraulic drive, strong power.

- Electric control screed head.

- Adopts Honda gasoline engine with electric start.

- Two kinds of tyres optional.

- Integrated computer controller, easy to operate.

Walk-Behind Laser Screed,Manual Walk-Behind Laser Screed,Somero Laser Screed,Somero S485 Laser Screed

Jining Furuide Machinery Manufacturing Co., Ltd. , https://www.furdroller.com