Development of Commercial Vehicle Brake System Business Dongfeng Technology to Collaborate with Knorr

Dongfeng Technology announced that it intends to establish East Corkenor Commercial Vehicle Brake Technology Co., Ltd. (hereinafter referred to as "Technology Company") and East Corkor Brake System for Commercial Vehicle Brake Systems with Knorr Brake Systems Asia Pacific (Holdings) Co., Ltd. ( Shiyan Co., Ltd. (hereinafter referred to as the "Sales Company") aims to develop long-term strategic cooperation with international brands and develop commercial vehicle brake system business.

According to the agreement between the two parties, the technology company plans to invest a total of 175 million yuan and its registered capital of 70 million yuan. Among them, Dongfeng Technology invested 34,300,000 yuan, equivalent to 49% of the equity of the technology company; Knorr Asia-Pacific invested 35.7 million yuan, equivalent to 51% of the equity of the technology company. The sales company has a total investment of 14.25 million yuan and a registered capital of 10 million yuan. Dongfeng Technology and Knorr-Asia Pacific have respectively invested 5.1 million yuan and 4.9 million yuan.

NewsOriginal Title: Dongfeng Technology Brings Foreign Investment in Commercial Vehicle Brake System Business

Home Appliance Plastic Molding refers to washing machine control anel plastic mould, washing machine tub mould and its plastic accessories, air condition frame Plastic Injection Mould and its plastic accessories, ice box or Refrigerator Plastic Injection Mould and its plastic accessories, and so on.


Mould Steel: 2738HH, NAK80, 738, 2344, S136, SDK61, P20, PX5 etc.

Mould Life: 50~100 shots
Material: PP
Cavity: 1*1
Applicable range: Home appliance
Lead Time: 35-45 days
Hot runner: (according to the customer's request and product style)
Standard part: PUNCH, MISUMI

First trial equipment: 380T Injection Machine( moreover we also have 90-700T, 750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.


Washing machine plastic control panel injection mould


The first mould tryout success rate is above 90%


Quotation: Provide quotation in 24 hours after received the customer's drawing.
The profile: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, who have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet your request of batch production.
Quality department: 15 members quality control workers, testing the mould and parts by CMM and projector.

Shipping incoterms: FOB/CIF/DDU by sea shipping or air shipping

Washing machine control rack plastic mould


Washing machine plastic top panel mould


If you have any doubts about plastic washing machine control panel mould, please don't hesitate to contact us at any time, we are very pleased to give you response in time, warmly welcome to visit our company, we are looking forward to hearing from you, thank you very much.


Home Appliance Injection Mould

Home Appliance Injection Mould,Home Appliance Mould,LED Lighting Plastic Injection Mould,Refrigerator Plastic Injection Mould

Zhejiang Ceeto Molding Technology Co.,Ltd. , http://www.ceetomold.com